Projects 69 KV POWER BAR EXTENSION WORKS, INSTALLATION OF NEW EQUIPMENT IN THE ELECTRICAL SUBSTATION YARD INSTALLATION OF ELECTRICAL DUCT BANK MANUFACTURING OF 13.8KV POWER CABLE JOINTS MEGGER HIGH VOLTAGE TESTING – VLF INSTALLATION OF MAJOR SWG EQUIPMENT IN 13.8KV / 34.5KV CONTROL ROOM Sandblasting and Painting ASSEMBLY OF STRUCTURES CIVIL CONSTRUCTION MANUFACTURING OF TANKS AND PIPES