- Projects
69 KV POWER BAR EXTENSION WORKS, INSTALLATION OF NEW EQUIPMENT IN THE ELECTRICAL SUBSTATION YARD




INSTALLATION OF ELECTRICAL DUCT BANK


MANUFACTURING OF 13.8KV POWER CABLE JOINTS


MEGGER HIGH VOLTAGE TESTING – VLF

INSTALLATION OF MAJOR SWG EQUIPMENT IN 13.8KV / 34.5KV CONTROL ROOM






Sandblasting and Painting




ASSEMBLY OF STRUCTURES


CIVIL CONSTRUCTION


MANUFACTURING OF TANKS AND PIPES

